Description
Foreground proxy for 1 h operation of a 60-ton crane during Pelamis assembly. Inventory follows Supplementary Table S1.9: 18 kWh of low-voltage electricity per crane-hour. The paper states that assembly equipment was represented using operating energy only; crane manufacture/capital goods are excluded.
Source
Scientific journal publication
Thomson, R.C., Chick, J.P. & Harrison, G.P. (2019), https://doi.org/10.1007/s11367-018-1504-2; supplementary inventory Tables S1.1-S1.10: https://static-content.springer.com/esm/art%3A10.1007%2Fs11367-018-1504-2/MediaObjects/11367_2018_1504_MOESM1_ESM.pdf; 2022 correction: https://doi.org/10.1007/s11367-021-02011-y