Description
Equipment-supply reference for 1 unit of pressurizer primary EPR. It provides the recorded material, processing and linked equipment inputs for the EPR construction supply chain.
Nuclear electricity
Reference product Pressurizer primary EPR RER
Stable dataset identity
pressurizer-primary-epr
1.0.1Published inventory
Process description and catalog context. View scientific metadata
Equipment-supply reference for 1 unit of pressurizer primary EPR. It provides the recorded material, processing and linked equipment inputs for the EPR construction supply chain.
Classification, keywords, bookmarks and download counts.
Classification path: Energy > Electricity > Nuclear electricity
Log in to bookmarkSource documentation, background profiles and references.
Scientific journal publication
Simons, A., Bauer, C. (2012). Life cycle assessment of the European pressurized reactor and the influence of different fuel cycle strategies. Proceedings of the Institution of Mechanical Engineers, Part A: Journal of Power and Energy 226(3), 427–444. https://doi.org/10.1177/0957650912440549
Inventory changes relative to source: Not assessed
Equivalence to the original source inventory has not been established.
These are the stored source profiles for this version. Foreground methodology is recorded in Scientific metadata.
Missing exchange uncertainty generation: Not requested
Representativeness scores use a 1–5 scale when provided. Lower scores indicate a closer fit to the modeled technology, geography, or time period.
Precalculated screening profile
Results per unit, using UVEK 2025 and the ecoinvent 3.10 biosphere. Exchange rows are shaded from green to red by relative contribution to the selected indicator.
This screening result uses Brightpath mappings from the source background to UVEK 2025; mapped suppliers are not claims of scientific equivalence.
Profile uvek-2025-ef-v3-1-4e70d56a85b1 · artifact
4e70d56a85b1 · calculated
2026-11-23 19:10 UTC. These screening results do not replace a reviewed comparative LCA.
Outputs
| Exchange | Reference / categories | Amount | Unit | Metadata | Climate change contribution |
|---|---|---|---|---|---|
|
pressurizer primary EPR
RER
|
Pressurizer primary EPR
Axpo NH 5b / year technologies
|
1
|
unit | Reference flow |
Inputs
| Exchange | Reference / categories | Amount | Unit | Metadata | Climate change contribution |
|---|---|---|---|---|---|
|
market for hot rolling, steel
GLO
|
hot rolling, steel
Materials/fuels
|
1.50e+05
|
kilogram |
33.9855
mol H+-Eq / unit
1.1% of total
24919
kg CO2-Eq / unit
4.5% of total
112092
CTUe / unit
5.3% of total
4.18718
kg P-Eq / unit
2.0% of total
12.589
kg N-Eq / unit
2.3% of total
121.577
mol N-Eq / unit
2.1% of total
3.0299e-05
CTUh / unit
0.3% of total
0.000452961
CTUh / unit
0.8% of total
18227.6
kBq U235-Eq / unit
12.2% of total
75263.7
dimensionless / unit
2.8% of total
0.000950565
kg CFC-11-Eq / unit
10.8% of total
0.00117077
disease incidence / unit
2.7% of total
103.184
kg NMVOC-Eq / unit
5.4% of total
543914
MJ, net calorific value / unit
7.2% of total
0.0236306
kg Sb-Eq / unit
0.1% of total
21242
m3 world Eq deprived / unit
12.9% of total
BAFU:2025
|
|
|
market for steel, chromium steel 18/8
GLO
|
steel, chromium steel 18/8
Materials/fuels
|
1.50e+05
|
kilogram |
3089.07
mol H+-Eq / unit
98.4% of total
521688
kg CO2-Eq / unit
94.8% of total
2.0036e+06
CTUe / unit
94.2% of total
201.487
kg P-Eq / unit
97.7% of total
524.671
kg N-Eq / unit
96.5% of total
5589.56
mol N-Eq / unit
96.8% of total
0.0109837
CTUh / unit
99.7% of total
0.0575619
CTUh / unit
99.2% of total
130337
kBq U235-Eq / unit
87.2% of total
2.5984e+06
dimensionless / unit
96.2% of total
0.0077017
kg CFC-11-Eq / unit
87.7% of total
0.0419105
disease incidence / unit
97.0% of total
1776.64
kg NMVOC-Eq / unit
93.4% of total
6.9101e+06
MJ, net calorific value / unit
92.0% of total
18.1968
kg Sb-Eq / unit
99.8% of total
140034
m3 world Eq deprived / unit
84.8% of total
BAFU:2025
|
|
|
market for transport, freight train
Europe without Switzerland
|
transport, freight train
Materials/fuels
|
3.30e+04
|
ton kilometer |
2.41707
mol H+-Eq / unit
0.1% of total
552.093
kg CO2-Eq / unit
0.1% of total
1454.05
CTUe / unit
0.1% of total
0.333353
kg P-Eq / unit
0.2% of total
0.803604
kg N-Eq / unit
0.1% of total
8.05231
mol N-Eq / unit
0.1% of total
6.6477e-07
CTUh / unit
0.0% of total
7.0227e-06
CTUh / unit
0.0% of total
541.187
kBq U235-Eq / unit
0.4% of total
10207.3
dimensionless / unit
0.4% of total
1.3423e-05
kg CFC-11-Eq / unit
0.2% of total
2.4875e-05
disease incidence / unit
0.1% of total
2.56803
kg NMVOC-Eq / unit
0.1% of total
10672.2
MJ, net calorific value / unit
0.1% of total
0.00123716
kg Sb-Eq / unit
0.0% of total
312.779
m3 world Eq deprived / unit
0.2% of total
BAFU:2025
|
|
|
market for transport, freight, lorry, unspecified
RER
|
transport, freight, lorry, unspecified
Materials/fuels
|
1.65e+04
|
ton kilometer |
13.0527
mol H+-Eq / unit
0.4% of total
3117.43
kg CO2-Eq / unit
0.6% of total
8869.61
CTUe / unit
0.4% of total
0.296722
kg P-Eq / unit
0.1% of total
5.36806
kg N-Eq / unit
1.0% of total
55.7828
mol N-Eq / unit
1.0% of total
1.0949e-06
CTUh / unit
0.0% of total
2.4205e-05
CTUh / unit
0.0% of total
360.072
kBq U235-Eq / unit
0.2% of total
18423.1
dimensionless / unit
0.7% of total
0.000116044
kg CFC-11-Eq / unit
1.3% of total
9.6335e-05
disease incidence / unit
0.2% of total
19.9125
kg NMVOC-Eq / unit
1.0% of total
45188.4
MJ, net calorific value / unit
0.6% of total
0.00730554
kg Sb-Eq / unit
0.0% of total
3614.86
m3 world Eq deprived / unit
2.2% of total
BAFU:2025
|
Read-only definitions preserved with this inventory version. Values are supplied by the source; CLIC does not evaluate formulas or recalculate exchange amounts and impact scores from them.
No parameter definitions were supplied with this inventory snapshot.
Reuse and provenance
Add this version to your basket, inspect original uploads, or reuse it in your LCA software.
Original source files are currently unavailable, but you can still add this version to your basket for generated package export.
Published versions are immutable and remain available.
Oldest to newest. Arrows show recorded revision links; each node describes the change introduced by that version.
First published inventory; no earlier version is available for comparison.
SupersededActivity and product names for pressurizer primary EPR now use consistent catalogue spelling across the inventory and its supplier references. The physical recipe is…
Published · Viewing · Latest| Version | Published | Reason for this version | Link |
|---|---|---|---|
| Version 1.0.1 | 2026-11-03 | Activity and product names for pressurizer primary EPR now use consistent catalogue spelling across the inventory and its supplier references. The physical recipe is unchanged. | Current view |
| Version 1.0.0 Superseded | Published 2026-07-15 | First published inventory; no earlier version is available for comparison. | Open version |
Activity and product names for pressurizer primary EPR now use consistent catalogue spelling across the inventory and its supplier references. The physical recipe is unchanged.
Source: https://doi.org/10.1177/0957650912440549.
Declared foreground licence: CC-BY-4.0. Source publications and external supplier inventories retain their own terms.
Activity and product names for pressurizer primary EPR now use consistent catalogue spelling across the inventory and its supplier references. The physical recipe is unchanged.
This comparison is permanently visible with the published version so users can assess every detected change before reuse.
| Exchange / scope | Field | Previous value | Revised value | Reason |
|---|---|---|---|---|
| pressurizer primary EPR (production / RER / unit) | Name | Pressurizer primary EPR | pressurizer primary EPR | Activity and product names now follow consistent catalogue spelling, so the intended inventory and its supplier references remain identifiable. |
| Exchange / scope | Field | Previous value | Revised value | Reason |
|---|---|---|---|---|
| Version metadata | Description | Simons A, Bauer C. Life cycle assessment of the Evolutionary Power Reactor (EPR) and the influence of different fuel cycle strategies. Proceedings of the Institution of Mechanical Engineers, Part A: Journal of Power and Energy. 2012;226(3):427-444. doi:10.1177/0957650912440549 | Equipment-supply reference for 1 unit of pressurizer primary EPR. It provides the recorded material, processing and linked equipment inputs for the EPR construction supply chain. | No explanation was recorded for this change. |
| Version metadata | Geographical representativeness | 1 | 3 | |
| Version metadata | Methodology and allocation explanation | The source is a 2012 prospective assessment of Swiss/French EPRs in 2030, using mixed-vintage fuel-cycle and infrastructure data. Table 4 distinguishes CH 1500 MWe from FR 1530 MWe; the common 1500-MWe description is not valid for the French scenario. The regional RER copy is not a separately tabulated source scenario. The paper's normal-operation boundaries exclude nuclear accidents. Equipment membership is traced only through unambiguous declared foreground links; underlying bills of materials and supplier/biosphere adaptations remain incompletely verified. | Simons and Bauer (2012) is the primary source for the prospective Swiss/French EPR study. Earlier inventory work by Roberto Dones and Roth et al. (2009) is acknowledged in that study. The component bill of materials and its adapted suppliers are retained from CLIC; the paper's aggregate technology table does not independently verify this equipment recipe. Study year 2012 and scenario year 2030 do not date every material or background input. | |
| Version metadata | Source | Simons, A., & Bauer, C. Life cycle assessment of the Evolutionary Power Reactor (EPR) and the influence of different fuel cycle strategies. Proceedings of the Institution of Mechanical Engineers, Part A: Journal of Power and Energy. 2012;226(3):427-444. https://doi.org/10.1177/0957650912440549 | Simons, A., Bauer, C. (2012). Life cycle assessment of the European pressurized reactor and the influence of different fuel cycle strategies. Proceedings of the Institution of Mechanical Engineers, Part A: Journal of Power and Energy 226(3), 427–444. https://doi.org/10.1177/0957650912440549 | |
| Version metadata | Contributors, publications, projects and supporting evidence | Funding: 1. Project: Url: https://doi.org/10.1177/0957650912440549 Funding: 1. Project: Name: Life cycle assessment of the European pressurized reactor and the influence of different fuel cycle strategies Funding: 1. Project: Acronym: Not set Funding: 1. Project: Relation: source_study Funding: 1. Project: Grant identifier: Not set Funding: 1. Organization: Ror: Not set Funding: 1. Organization: Url: Not set Funding: 1. Organization: Name: Axpo Holding AG Funding: 1. Award identifier: Not set Evidence: 1. Origin: editor_verification Evidence: 1. Target field: data_origins Evidence: 1. Qualification: Exact documented origins; no claim that every flow is measured. Evidence: 1. Source location: source Evidence: 1. Source reference: Existing published CLIC inventory documentation Evidence: 2. Origin: editor_verification Evidence: 2. Target field: intended_application Evidence: 2. Qualification: Source-linked modelling context; no 2030 component year or measured manufacturer inventory is inferred. Evidence: 2. Source location: source Evidence: 2. Source reference: Existing published CLIC inventory documentation Evidence: 3. Origin: editor_verification Evidence: 3. Target field: publications Evidence: 3. Qualification: Bibliographic details refer to this explicitly cited DOI. Existing citation text is retained, including any additional sources. Publication year does not establish the inventory reference year; publication authors are not assigned as inventory compilers. Evidence: 3. Source location: DOI registration: title, publication dates and byline Evidence: 3. Source reference: https://api.crossref.org/works/10.1177%2F0957650912440549 Evidence: 4. Origin: editor_verification Evidence: 4. Target field: publications Evidence: 4. Qualification: Canonical institutional identity only. Preserve historical declared spelling, departments, attribution and funding relationships; identity verification alone does not verify an award or its scope. Evidence: 4. Source location: Organization identity and registered names Evidence: 4. Source reference: https://api.ror.org/v2/organizations/03eh3y714 Evidence: 5. Origin: editor_verification Evidence: 5. Target field: publications Evidence: 5. Qualification: Canonical primary and legacy citations are aligned without changing freeform source, inventory source text or inventory contributors. Publication year is not a measurement/reference year. EPR underlying inventories are acknowledged to Roberto Dones and Roth et al. (2009); component quantities are not all printed in the 2012 article. Preserve each declared source role and historical affiliation. Evidence: 5. Source location: Original paper/SI byline; pinned DOI registration and institutional identity evidence Evidence: 5. Source reference: https://doi.org/10.1177/0957650912440549 Evidence: 6. Origin: editor_verification Evidence: 6. Target field: methodology_notes Evidence: 6. Qualification: Distinguish electricity, dedicated plant equipment and fuel-cycle supply roles. Only CH/FR electricity nodes receive the explicit 2030 model year. No component measurement year, capacity factor, numeric TRL or accident-risk result is inferred. Evidence: 6. Source location: Table 4, source scope and acknowledgements; foreground equipment paths Evidence: 6. Source reference: https://doi.org/10.1177/0957650912440549 Evidence: 7. Origin: editor_verification Evidence: 7. Target field: funding Evidence: 7. Qualification: Axpo Holding AG funded the cited study. The project declaration is labelled by the paper title with relation source_study; no formal grant/acronym is invented and no funding of the CLIC adaptation is inferred. Evidence: 7. Source location: Source funding statement immediately before acknowledgements Evidence: 7. Source reference: https://doi.org/10.1177/0957650912440549 Projects: 1. Url: https://doi.org/10.1177/0957650912440549 Projects: 1. Name: Life cycle assessment of the European pressurized reactor and the influence of different fuel cycle strategies Projects: 1. Acronym: Not set Projects: 1. Relation: source_study Projects: 1. Grant identifier: Not set Publications: 1. Doi: 10.1177/0957650912440549 Publications: 1. Url: https://doi.org/10.1177/0957650912440549 Publications: 1. Title: Life cycle assessment of the European pressurized reactor and the influence of different fuel cycle strategies Publications: 1. Scientific authors: 1. Name: Andrew Simons Publications: 1. Scientific authors: 1. Orcid: Not set Publications: 1. Scientific authors: 1. Affiliations: 1. Ror: https://ror.org/03eh3y714 Publications: 1. Scientific authors: 1. Affiliations: 1. Url: Not set Publications: 1. Scientific authors: 1. Affiliations: 1. Name: Laboratory for Energy Systems Analysis, Paul Scherrer Institute, Villigen PSI, Switzerland Publications: 1. Scientific authors: 2. Name: Christian Bauer Publications: 1. Scientific authors: 2. Orcid: 0000-0002-1083-9200 Publications: 1. Scientific authors: 2. Affiliations: 1. Ror: https://ror.org/03eh3y714 Publications: 1. Scientific authors: 2. Affiliations: 1. Url: Not set Publications: 1. Scientific authors: 2. Affiliations: 1. Name: Laboratory for Energy Systems Analysis, Paul Scherrer Institute, Villigen PSI, Switzerland Publications: 1. Citation: Simons, A., Bauer, C. (2012). Life cycle assessment of the European pressurized reactor and the influence of different fuel cycle strategies. Proceedings of the Institution of Mechanical Engineers, Part A: Journal of Power and Energy 226(3), 427–444. https://doi.org/10.1177/0957650912440549 Publications: 1. Relation: primary_source Publications: 1. Source type: scientific_journal Publications: 1. Publication year: 2012 |
Funding: 1. Project: Url: https://doi.org/10.1177/0957650912440549 Funding: 1. Project: Name: Life cycle assessment of the European pressurized reactor and the influence of different fuel cycle strategies Funding: 1. Project: Acronym: Not set Funding: 1. Project: Relation: source_study Funding: 1. Project: Grant identifier: Not set Funding: 1. Organization: Ror: Not set Funding: 1. Organization: Url: Not set Funding: 1. Organization: Name: Axpo Holding AG Funding: 1. Award identifier: Not set Evidence: 1. Origin: editor_verification Evidence: 1. Target field: data_origins Evidence: 1. Qualification: Exact documented origins; no claim that every flow is measured. Evidence: 1. Source location: source Evidence: 1. Source reference: Existing published CLIC inventory documentation Evidence: 2. Origin: editor_verification Evidence: 2. Target field: intended_application Evidence: 2. Qualification: Source-linked modelling context; no 2030 component year or measured manufacturer inventory is inferred. Evidence: 2. Source location: source Evidence: 2. Source reference: Existing published CLIC inventory documentation Evidence: 3. Origin: editor_verification Evidence: 3. Target field: publications Evidence: 3. Qualification: Bibliographic details refer to this explicitly cited DOI. Existing citation text is retained, including any additional sources. Publication year does not establish the inventory reference year; publication authors are not assigned as inventory compilers. Evidence: 3. Source location: DOI registration: title, publication dates and byline Evidence: 3. Source reference: https://api.crossref.org/works/10.1177%2F0957650912440549 Evidence: 4. Origin: editor_verification Evidence: 4. Target field: publications Evidence: 4. Qualification: Canonical institutional identity only. Preserve historical declared spelling, departments, attribution and funding relationships; identity verification alone does not verify an award or its scope. Evidence: 4. Source location: Organization identity and registered names Evidence: 4. Source reference: https://api.ror.org/v2/organizations/03eh3y714 Evidence: 5. Origin: editor_verification Evidence: 5. Target field: publications Evidence: 5. Qualification: Canonical primary and legacy citations are aligned without changing freeform source, inventory source text or inventory contributors. Publication year is not a measurement/reference year. EPR underlying inventories are acknowledged to Roberto Dones and Roth et al. (2009); component quantities are not all printed in the 2012 article. Preserve each declared source role and historical affiliation. Evidence: 5. Source location: Original paper/SI byline; pinned DOI registration and institutional identity evidence Evidence: 5. Source reference: https://doi.org/10.1177/0957650912440549 Evidence: 6. Origin: editor_verification Evidence: 6. Target field: methodology_notes Evidence: 6. Qualification: Distinguish electricity, dedicated plant equipment and fuel-cycle supply roles. Only CH/FR electricity nodes receive the explicit 2030 model year. No component measurement year, capacity factor, numeric TRL or accident-risk result is inferred. Evidence: 6. Source location: Table 4, source scope and acknowledgements; foreground equipment paths Evidence: 6. Source reference: https://doi.org/10.1177/0957650912440549 Evidence: 7. Origin: editor_verification Evidence: 7. Target field: funding Evidence: 7. Qualification: Axpo Holding AG funded the cited study. The project declaration is labelled by the paper title with relation source_study; no formal grant/acronym is invented and no funding of the CLIC adaptation is inferred. Evidence: 7. Source location: Source funding statement immediately before acknowledgements Evidence: 7. Source reference: https://doi.org/10.1177/0957650912440549 Evidence: 8. Origin: editor_verification Evidence: 8. Target field: technology_description Evidence: 8. Qualification: Technical-characterisation review TC-2215. Design capacity: Unspecified. Basis: No new independently verified plant/component output, utilization or life value; retain qualified existing equipment labels. Do not transfer whole-reactor characteristics to components or fuel factories. Evidence classification: guarded source table and reference boundary review. Confidence: high for retained source assumption not measured performance. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 8. Source location: fields/design_capacity; source Tables4–5 and exact component scope Evidence: 8. Source reference: https://doi.org/10.1177/0957650912440549 Evidence: 9. Origin: editor_verification Evidence: 9. Target field: technology_description Evidence: 9. Qualification: Technical-characterisation review TC-2215. Design capacity unit: Unspecified. Basis: No new independently verified plant/component output, utilization or life value; retain qualified existing equipment labels. Do not transfer whole-reactor characteristics to components or fuel factories. Evidence classification: guarded source table and reference boundary review. Confidence: high for retained source assumption not measured performance. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 9. Source location: fields/design_capacity_unit; source Tables4–5 and exact component scope Evidence: 9. Source reference: https://doi.org/10.1177/0957650912440549 Evidence: 10. Origin: editor_verification Evidence: 10. Target field: technology_description Evidence: 10. Qualification: Technical-characterisation review TC-2215. Capacity factor (%): Unspecified. Basis: No new independently verified plant/component output, utilization or life value; retain qualified existing equipment labels. Do not transfer whole-reactor characteristics to components or fuel factories. Evidence classification: guarded source table and reference boundary review. Confidence: high for retained source assumption not measured performance. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 10. Source location: fields/capacity_factor_percent; source Tables4–5 and exact component scope Evidence: 10. Source reference: https://doi.org/10.1177/0957650912440549 Evidence: 11. Origin: editor_verification Evidence: 11. Target field: technology_description Evidence: 11. Qualification: Technical-characterisation review TC-2215. Annual production volume: Unspecified. Basis: No new independently verified plant/component output, utilization or life value; retain qualified existing equipment labels. Do not transfer whole-reactor characteristics to components or fuel factories. Evidence classification: guarded source table and reference boundary review. Confidence: high for retained source assumption not measured performance. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 11. Source location: fields/annual_production_volume; source Tables4–5 and exact component scope Evidence: 11. Source reference: https://doi.org/10.1177/0957650912440549 Evidence: 12. Origin: editor_verification Evidence: 12. Target field: technology_description Evidence: 12. Qualification: Technical-characterisation review TC-2215. Annual production volume unit: Unspecified. Basis: No new independently verified plant/component output, utilization or life value; retain qualified existing equipment labels. Do not transfer whole-reactor characteristics to components or fuel factories. Evidence classification: guarded source table and reference boundary review. Confidence: high for retained source assumption not measured performance. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 12. Source location: fields/annual_production_volume_unit; source Tables4–5 and exact component scope Evidence: 12. Source reference: https://doi.org/10.1177/0957650912440549 Evidence: 13. Origin: editor_verification Evidence: 13. Target field: technology_description Evidence: 13. Qualification: Technical-characterisation review TC-2215. Annual production volume year: Unspecified. Basis: No new independently verified plant/component output, utilization or life value; retain qualified existing equipment labels. Do not transfer whole-reactor characteristics to components or fuel factories. Evidence classification: guarded source table and reference boundary review. Confidence: high for retained source assumption not measured performance. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 13. Source location: fields/annual_production_volume_year; source Tables4–5 and exact component scope Evidence: 13. Source reference: https://doi.org/10.1177/0957650912440549 Evidence: 14. Origin: editor_verification Evidence: 14. Target field: technology_description Evidence: 14. Qualification: Technical-characterisation review TC-2215. Plant or represented-asset lifetime (years): Unspecified. Basis: No new independently verified plant/component output, utilization or life value; retain qualified existing equipment labels. Do not transfer whole-reactor characteristics to components or fuel factories. Evidence classification: guarded source table and reference boundary review. Confidence: high for retained source assumption not measured performance. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 14. Source location: fields/plant_lifetime_years; source Tables4–5 and exact component scope Evidence: 14. Source reference: https://doi.org/10.1177/0957650912440549 Evidence: 15. Origin: editor_verification Evidence: 15. Target field: technology_description Evidence: 15. Qualification: Technical-characterisation review TC-2215. Commercial maturity stage: early_commercial. Basis: Retain the legacy early-commercial assessment as EPR supply-chain/scenario context, not independent proof of this exact component's market stage. The 2012 prospective model and a source inventory package do not establish present-day deployment or procurement qualification. Evidence classification: source scenario and exact process boundary assessment. Confidence: medium curator judgement with explicit scope limits. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 15. Source location: Study scope and Tables4–5; exact retained EPR component/fuel-service review Evidence: 15. Source reference: https://doi.org/10.1177/0957650912440549 Evidence: 16. Origin: editor_verification Evidence: 16. Target field: technology_description Evidence: 16. Qualification: Technical-characterisation review TC-2215. Technology readiness level: 8. Basis: Retain the legacy EPR-context curator rating with an explicit component-scope limitation. It is not a publisher-assigned score for every cable, fuel-cycle or procurement helper and does not certify the material bill or nuclear qualification. Exact own-component readiness remains a source-scope question. Evidence classification: source scenario and exact process boundary assessment. Confidence: medium curator judgement with explicit scope limits. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 16. Source location: Study scope and Tables4–5; exact retained EPR component/fuel-service review Evidence: 16. Source reference: https://doi.org/10.1177/0957650912440549 Evidence: 17. Origin: editor_verification Evidence: 17. Target field: technology_description Evidence: 17. Qualification: Technical-characterisation review TC-2215. Technological representativeness: 4. Basis: The paper models prospective 2030 EPR pathways with mixed-vintage background information. Exact component inventories contain material/processing proxies and incompletely verified source bills. They meet the prospective/proxy representation category4, rather than a claim of observed industrial operating data for each item. Evidence classification: source scenario and exact process boundary assessment. Confidence: medium curator judgement with explicit scope limits. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 17. Source location: Study scope and Tables4–5; exact retained EPR component/fuel-service review Evidence: 17. Source reference: https://doi.org/10.1177/0957650912440549 Evidence: 18. Origin: editor_verification Evidence: 18. Target field: technology_description Evidence: 18. Qualification: Technical-characterisation review TC-2215. Geographical representativeness: 3. Basis: RER is an archived regional proxy and is not a separately tabulated scenario in the source paper; category3 reflects generic regional transfer. CH/FR labels retain their source scenario matching, without claiming a measured manufacturing site or operating reactor sample for each component. Evidence classification: source scenario and exact process boundary assessment. Confidence: medium curator judgement with explicit scope limits. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 18. Source location: Study scope and Tables4–5; exact retained EPR component/fuel-service review Evidence: 18. Source reference: https://doi.org/10.1177/0957650912440549 Evidence: 19. Origin: editor_verification Evidence: 19. Target field: technology_description Evidence: 19. Qualification: Technical-characterisation review TC-2215. Temporal representativeness: 4. Basis: The 2030 date is a scenario horizon in a 2012 prospective study, not a future measurement year or a refresh of underlying manufacturing inputs. The retained scenario/proxy inventories meet category4 for prospective or stale representation; source publication and plant-life assumptions do not supply measurement coverage. Evidence classification: source scenario and exact process boundary assessment. Confidence: medium curator judgement with explicit scope limits. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 19. Source location: Study scope and Tables4–5; exact retained EPR component/fuel-service review Evidence: 19. Source reference: https://doi.org/10.1177/0957650912440549 Projects: 1. Url: https://doi.org/10.1177/0957650912440549 Projects: 1. Name: Life cycle assessment of the European pressurized reactor and the influence of different fuel cycle strategies Projects: 1. Acronym: Not set Projects: 1. Relation: source_study Projects: 1. Grant identifier: Not set Publications: 1. Doi: 10.1177/0957650912440549 Publications: 1. Url: https://doi.org/10.1177/0957650912440549 Publications: 1. Title: Life cycle assessment of the European pressurized reactor and the influence of different fuel cycle strategies Publications: 1. Scientific authors: 1. Name: Andrew Simons Publications: 1. Scientific authors: 1. Orcid: Not set Publications: 1. Scientific authors: 1. Affiliations: 1. Ror: https://ror.org/03eh3y714 Publications: 1. Scientific authors: 1. Affiliations: 1. Url: Not set Publications: 1. Scientific authors: 1. Affiliations: 1. Name: Laboratory for Energy Systems Analysis, Paul Scherrer Institute, Villigen PSI, Switzerland Publications: 1. Scientific authors: 2. Name: Christian Bauer Publications: 1. Scientific authors: 2. Orcid: 0000-0002-1083-9200 Publications: 1. Scientific authors: 2. Affiliations: 1. Ror: https://ror.org/03eh3y714 Publications: 1. Scientific authors: 2. Affiliations: 1. Url: Not set Publications: 1. Scientific authors: 2. Affiliations: 1. Name: Laboratory for Energy Systems Analysis, Paul Scherrer Institute, Villigen PSI, Switzerland Publications: 1. Citation: Simons, A., Bauer, C. (2012). Life cycle assessment of the European pressurized reactor and the influence of different fuel cycle strategies. Proceedings of the Institution of Mechanical Engineers, Part A: Journal of Power and Energy 226(3), 427–444. https://doi.org/10.1177/0957650912440549 Publications: 1. Relation: primary_source Publications: 1. Source type: scientific_journal Publications: 1. Publication year: 2012 |
|
| Version metadata | Technological representativeness | 2 | 4 | |
| Version metadata | Temporal representativeness | 3 | 4 | |
| Version metadata | Intended application | Foreground modelling of the declared EPR hardware, fuel-cycle or electricity-production configuration. | Equipment supply within the linked EPR infrastructure model, using the declared procurement unit and supplier profile. | Apply reviewed discovery metadata and change explanations from the curated release. |
| Version metadata | System boundary | Not set | Declared equipment or procurement package and its recorded upstream materials, forming, freight and component suppliers. Whole-plant operation, replacement schedule and decommissioning are separate from this supply reference unless explicitly represented by an exchange. | |
| Version metadata | Technology description | Not set | Primary-circuit pressurizer package represented by chromium steel, hot rolling and freight. Vessel volume, operating pressure and heater rating are not separately established by the material module. | |
| Version metadata | Limitations on use | Not set | The bill of materials is not independently validated by the paper's aggregate plant characteristics. Plant capacity, 60-year reactor life and fuel-cycle assumptions do not automatically specify this component's rating, service life or production volume. Supplier/biosphere adaptations, package completeness and freight ownership remain qualified. | |
| Version metadata | Name | Pressurizer primary EPR | pressurizer primary EPR | Activity and product names now follow consistent catalogue spelling, so the intended inventory and its supplier references remain identifiable. |
Publication route
This inventory was restored from a public CLIC archive. Its original publication route is Curator-led bulk import; private review and workflow records were not transferred.
Use this form to report a problem with this dataset or version. To report an individual public comment, use “Report this comment” beside that comment. To propose better numerical inventory data, use “Suggest an inventory improvement” in the inventory section.
Log in to report content