|
Version metadata
|
Commercial maturity stage |
first_commercial |
mature_commercial |
No explanation was recorded for this change. |
|
Version metadata
|
Inventory evidence types |
Literature; Engineering estimate |
Literature |
|
Version metadata
|
Geographical representativeness |
2 |
3 |
|
Version metadata
|
Methodology and allocation explanation |
Volkart et al. (2013) compare prospective 2025/2050 power and cement systems. The paper's base CCS case uses 200 km pipeline transport and a 1000 m saline-aquifer depth, with 110 bar CO2 transport pressure. Individual CLIC capture, storage, infrastructure and conversion nodes have distinct reference units and adaptations; the publication year is not a common inventory measurement year. The retrieved supplementary XLS contains five cement GHG result decompositions, not a native process inventory; these LCIA results must not be compared as exchange amounts. Source-study CARMA funding roles are preserved without extending them to later CLIC adaptations. |
Volkart et al. (2013) model prospective European power and cement systems for 2025 and 2050. The reference CCS chain assumes a 200 km pipeline, storage in a saline aquifer at 1000 m depth and CO2 compression to 110 bar. The pipeline and wells have assumed 30-year lives, with 20 bar injection overpressure. These are source scenario assumptions; the route, depth, reference unit and supplier adaptations of this individual record govern its use. Publication in 2013 does not establish a common inventory measurement year. |
|
Version metadata
|
Source |
Life cycle assessment of carbon capture and storage in power generation and industry in Europe, Volkart et al., 2013, International Journal of Greenhouse Gas Control |
Volkart, K., Bauer, C., Boulet, C. (2013). Life cycle assessment of carbon capture and storage in power generation and industry in Europe. International Journal of Greenhouse Gas Control 16, 91–106. https://doi.org/10.1016/j.ijggc.2013.03.003 |
|
Version metadata
|
Contributors, publications, projects and supporting evidence |
Funding: 1. Project: Url: https://www.psi.ch/fr/eem/projects/carma Funding: 1. Project: Name: CARbon dioxide MAnagement in power generation Funding: 1. Project: Acronym: CARMA Funding: 1. Project: Relation: source_study Funding: 1. Project: Grant identifier: Not set Funding: 1. Organization: Ror: Not set Funding: 1. Organization: Url: Not set Funding: 1. Organization: Name: Swisselectric Research Funding: 1. Award identifier: Not set Funding: 2. Project: Url: https://www.psi.ch/fr/eem/projects/carma Funding: 2. Project: Name: CARbon dioxide MAnagement in power generation Funding: 2. Project: Acronym: CARMA Funding: 2. Project: Relation: source_study Funding: 2. Project: Grant identifier: Not set Funding: 2. Organization: Ror: https://ror.org/005616b46 Funding: 2. Organization: Url: Not set Funding: 2. Organization: Name: Competence Center for Energy and Mobility (CCEM) Funding: 2. Award identifier: Not set Funding: 3. Project: Url: https://www.psi.ch/fr/eem/projects/carma Funding: 3. Project: Name: CARbon dioxide MAnagement in power generation Funding: 3. Project: Acronym: CARMA Funding: 3. Project: Relation: source_study Funding: 3. Project: Grant identifier: Not set Funding: 3. Organization: Ror: Not set Funding: 3. Organization: Url: Not set Funding: 3. Organization: Name: Competence Center for Environment and Sustainability (CCES) Funding: 3. Award identifier: Not set Funding: 4. Project: Url: https://www.psi.ch/fr/eem/projects/carma Funding: 4. Project: Name: CARbon dioxide MAnagement in power generation Funding: 4. Project: Acronym: CARMA Funding: 4. Project: Relation: source_study Funding: 4. Project: Grant identifier: Not set Funding: 4. Organization: Ror: Not set Funding: 4. Organization: Url: Not set Funding: 4. Organization: Name: Alstom Funding: 4. Award identifier: Not set Funding: 5. Project: Url: https://www.psi.ch/fr/eem/projects/carma Funding: 5. Project: Name: CARbon dioxide MAnagement in power generation Funding: 5. Project: Acronym: CARMA Funding: 5. Project: Relation: source_study Funding: 5. Project: Grant identifier: Not set Funding: 5. Organization: Ror: https://ror.org/020ddnn22 Funding: 5. Organization: Url: Not set Funding: 5. Organization: Name: Swiss Federal Office of Energy Funding: 5. Award identifier: Not set Evidence: 1. Origin: source_import Evidence: 1. Target field: publications Evidence: 1. Qualification: Append/deduplicate these references within this version. Preserve original_citation/original_doi and reconcile any existing primary source. Model ancestry is not automatically inventory authorship. Evidence: 1. Source location: source Evidence: 1. Source reference: Existing published CLIC inventory documentation Evidence: 2. Origin: editor_verification Evidence: 2. Target field: publications Evidence: 2. Qualification: Append/deduplicate these references within this version. Preserve original_citation/original_doi and reconcile any existing primary source. Model ancestry is not automatically inventory authorship. Evidence: 2. Source location: Publisher-deposited registry /message/title, /message/published and /message/author Evidence: 2. Source reference: https://api.crossref.org/works/10.1016%2Fj.ijggc.2013.03.003 Evidence: 3. Origin: source_import Evidence: 3. Target field: data_origins Evidence: 3. Qualification: Documented inputs to this compilation/model, not newly measured data. Omitted tags remain unspecified. Literature denotes cited inventory sources. Evidence: 3. Source location: source Evidence: 3. Source reference: Existing published CLIC inventory documentation Evidence: 4. Origin: source_import Evidence: 4. Target field: data_origins Evidence: 4. Qualification: Documented inputs to this compilation/model, not newly measured data. Omitted tags remain unspecified. Literature denotes cited inventory sources. Evidence: 4. Source location: description Evidence: 4. Source reference: Existing published CLIC inventory documentation Evidence: 5. Origin: source_import Evidence: 5. Target field: projects Evidence: 5. Qualification: Verified CARMA source study; duration 2009–2013 is not inventory time coverage. Evidence: 5. Source location: inventory_snapshot/worksheet name Evidence: 5. Source reference: Existing published CLIC inventory documentation Evidence: 6. Origin: editor_verification Evidence: 6. Target field: projects Evidence: 6. Qualification: Verified CARMA source study; duration 2009–2013 is not inventory time coverage. Evidence: 6. Source location: Project heading and details Evidence: 6. Source reference: https://www.psi.ch/fr/eem/projects/carma Evidence: 7. Origin: source_import Evidence: 7. Target field: projects Evidence: 7. Qualification: Verified CARMA source study; duration 2009–2013 is not inventory time coverage. Evidence: 7. Source location: source Evidence: 7. Source reference: Existing published CLIC inventory documentation Evidence: 8. Origin: source_import Evidence: 8. Target field: funding Evidence: 8. Qualification: Original-project financing only; not later adaptation or CLIC funding. Evidence: 8. Source location: inventory_snapshot/worksheet name Evidence: 8. Source reference: Existing published CLIC inventory documentation Evidence: 9. Origin: editor_verification Evidence: 9. Target field: funding Evidence: 9. Qualification: Original-project financing only; not later adaptation or CLIC funding. Evidence: 9. Source location: Project details / Financing Evidence: 9. Source reference: https://www.psi.ch/fr/eem/projects/carma Evidence: 10. Origin: editor_verification Evidence: 10. Target field: funding Evidence: 10. Qualification: Canonical institutional identity only. Preserve historical declared spelling, departments, attribution and funding relationships; identity verification alone does not verify an award or its scope. Evidence: 10. Source location: Organization identity and registered names Evidence: 10. Source reference: https://api.ror.org/v2/organizations/020ddnn22 Evidence: 11. Origin: editor_verification Evidence: 11. Target field: publications Evidence: 11. Qualification: Canonical primary and legacy citations are aligned without changing freeform source, inventory source text or inventory contributors. Publication year is not a measurement/reference year. EPR underlying inventories are acknowledged to Roberto Dones and Roth et al. (2009); component quantities are not all printed in the 2012 article. Preserve each declared source role and historical affiliation. Evidence: 11. Source location: Original paper/SI byline; pinned DOI registration and institutional identity evidence Evidence: 11. Source reference: https://doi.org/10.1016/j.ijggc.2013.03.003 Evidence: 12. Origin: editor_verification Evidence: 12. Target field: methodology_notes Evidence: 12. Qualification: Volkart et al. (2013) compare prospective 2025/2050 power and cement systems. The paper's base CCS case uses 200 km pipeline transport and a 1000 m saline-aquifer depth, with 110 bar CO2 transport pressure. Individual CLIC capture, storage, infrastructure and conversion nodes have distinct reference units and adaptations; the publication year is not a common inventory measurement year. The retrieved supplementary XLS contains five cement GHG result decompositions, not a native process inventory; these LCIA results must not be compared as exchange amounts. Source-study CARMA funding roles are preserved without extending them to later CLIC adaptations. Evidence: 12. Source location: Sections 2.1–2.2, source Tables 1–3 and original supplementary XLS Evidence: 12. Source reference: https://doi.org/10.1016/j.ijggc.2013.03.003 Projects: 1. Url: https://www.psi.ch/fr/eem/projects/carma Projects: 1. Name: CARbon dioxide MAnagement in power generation Projects: 1. Acronym: CARMA Projects: 1. Relation: source_study Projects: 1. Grant identifier: Not set Publications: 1. Doi: 10.1016/j.ijggc.2013.03.003 Publications: 1. Url: https://doi.org/10.1016/j.ijggc.2013.03.003 Publications: 1. Title: Life cycle assessment of carbon capture and storage in power generation and industry in Europe Publications: 1. Scientific authors: 1. Name: Kathrin Volkart Publications: 1. Scientific authors: 1. Orcid: Not set Publications: 1. Scientific authors: 1. Affiliations: 1. Ror: https://ror.org/03eh3y714 Publications: 1. Scientific authors: 1. Affiliations: 1. Url: https://www.psi.ch/ Publications: 1. Scientific authors: 1. Affiliations: 1. Name: Laboratory for Energy Systems Analysis, Paul Scherrer Institute, Villigen PSI, Switzerland Publications: 1. Scientific authors: 2. Name: Christian Bauer Publications: 1. Scientific authors: 2. Orcid: 0000-0002-1083-9200 Publications: 1. Scientific authors: 2. Affiliations: 1. Ror: https://ror.org/03eh3y714 Publications: 1. Scientific authors: 2. Affiliations: 1. Url: https://www.psi.ch/ Publications: 1. Scientific authors: 2. Affiliations: 1. Name: Laboratory for Energy Systems Analysis, Paul Scherrer Institute, Villigen PSI, Switzerland Publications: 1. Scientific authors: 3. Name: Céline Boulet Publications: 1. Scientific authors: 3. Orcid: Not set Publications: 1. Scientific authors: 3. Affiliations: 1. Ror: https://ror.org/03eh3y714 Publications: 1. Scientific authors: 3. Affiliations: 1. Url: https://www.psi.ch/ Publications: 1. Scientific authors: 3. Affiliations: 1. Name: Laboratory for Energy Systems Analysis, Paul Scherrer Institute, Villigen PSI, Switzerland Publications: 1. Citation: Volkart, K., Bauer, C., Boulet, C. (2013). Life cycle assessment of carbon capture and storage in power generation and industry in Europe. International Journal of Greenhouse Gas Control 16, 91–106. https://doi.org/10.1016/j.ijggc.2013.03.003 Publications: 1. Relation: primary_source Publications: 1. Source type: scientific_journal Publications: 1. Publication year: 2013 |
Funding: 1. Project: Url: https://www.psi.ch/fr/eem/projects/carma Funding: 1. Project: Name: CARbon dioxide MAnagement in power generation Funding: 1. Project: Acronym: CARMA Funding: 1. Project: Relation: source_study Funding: 1. Project: Grant identifier: Not set Funding: 1. Organization: Ror: Not set Funding: 1. Organization: Url: Not set Funding: 1. Organization: Name: Swisselectric Research Funding: 1. Award identifier: Not set Funding: 2. Project: Url: https://www.psi.ch/fr/eem/projects/carma Funding: 2. Project: Name: CARbon dioxide MAnagement in power generation Funding: 2. Project: Acronym: CARMA Funding: 2. Project: Relation: source_study Funding: 2. Project: Grant identifier: Not set Funding: 2. Organization: Ror: https://ror.org/005616b46 Funding: 2. Organization: Url: Not set Funding: 2. Organization: Name: Competence Center for Energy and Mobility (CCEM) Funding: 2. Award identifier: Not set Funding: 3. Project: Url: https://www.psi.ch/fr/eem/projects/carma Funding: 3. Project: Name: CARbon dioxide MAnagement in power generation Funding: 3. Project: Acronym: CARMA Funding: 3. Project: Relation: source_study Funding: 3. Project: Grant identifier: Not set Funding: 3. Organization: Ror: Not set Funding: 3. Organization: Url: Not set Funding: 3. Organization: Name: Competence Center for Environment and Sustainability (CCES) Funding: 3. Award identifier: Not set Funding: 4. Project: Url: https://www.psi.ch/fr/eem/projects/carma Funding: 4. Project: Name: CARbon dioxide MAnagement in power generation Funding: 4. Project: Acronym: CARMA Funding: 4. Project: Relation: source_study Funding: 4. Project: Grant identifier: Not set Funding: 4. Organization: Ror: Not set Funding: 4. Organization: Url: Not set Funding: 4. Organization: Name: Alstom Funding: 4. Award identifier: Not set Funding: 5. Project: Url: https://www.psi.ch/fr/eem/projects/carma Funding: 5. Project: Name: CARbon dioxide MAnagement in power generation Funding: 5. Project: Acronym: CARMA Funding: 5. Project: Relation: source_study Funding: 5. Project: Grant identifier: Not set Funding: 5. Organization: Ror: https://ror.org/020ddnn22 Funding: 5. Organization: Url: Not set Funding: 5. Organization: Name: Swiss Federal Office of Energy Funding: 5. Award identifier: Not set Evidence: 1. Origin: source_import Evidence: 1. Target field: publications Evidence: 1. Qualification: Append/deduplicate these references within this version. Preserve original_citation/original_doi and reconcile any existing primary source. Model ancestry is not automatically inventory authorship. Evidence: 1. Source location: source Evidence: 1. Source reference: Existing published CLIC inventory documentation Evidence: 2. Origin: editor_verification Evidence: 2. Target field: publications Evidence: 2. Qualification: Append/deduplicate these references within this version. Preserve original_citation/original_doi and reconcile any existing primary source. Model ancestry is not automatically inventory authorship. Evidence: 2. Source location: Publisher-deposited registry /message/title, /message/published and /message/author Evidence: 2. Source reference: https://api.crossref.org/works/10.1016%2Fj.ijggc.2013.03.003 Evidence: 3. Origin: source_import Evidence: 3. Target field: data_origins Evidence: 3. Qualification: Documented inputs to this compilation/model, not newly measured data. Omitted tags remain unspecified. Literature denotes cited inventory sources. Evidence: 3. Source location: source Evidence: 3. Source reference: Existing published CLIC inventory documentation Evidence: 4. Origin: source_import Evidence: 4. Target field: projects Evidence: 4. Qualification: Verified CARMA source study; duration 2009–2013 is not inventory time coverage. Evidence: 4. Source location: inventory_snapshot/worksheet name Evidence: 4. Source reference: Existing published CLIC inventory documentation Evidence: 5. Origin: editor_verification Evidence: 5. Target field: projects Evidence: 5. Qualification: Verified CARMA source study; duration 2009–2013 is not inventory time coverage. Evidence: 5. Source location: Project heading and details Evidence: 5. Source reference: https://www.psi.ch/fr/eem/projects/carma Evidence: 6. Origin: source_import Evidence: 6. Target field: projects Evidence: 6. Qualification: Verified CARMA source study; duration 2009–2013 is not inventory time coverage. Evidence: 6. Source location: source Evidence: 6. Source reference: Existing published CLIC inventory documentation Evidence: 7. Origin: source_import Evidence: 7. Target field: funding Evidence: 7. Qualification: Original-project financing only; not later adaptation or CLIC funding. Evidence: 7. Source location: inventory_snapshot/worksheet name Evidence: 7. Source reference: Existing published CLIC inventory documentation Evidence: 8. Origin: editor_verification Evidence: 8. Target field: funding Evidence: 8. Qualification: Original-project financing only; not later adaptation or CLIC funding. Evidence: 8. Source location: Project details / Financing Evidence: 8. Source reference: https://www.psi.ch/fr/eem/projects/carma Evidence: 9. Origin: editor_verification Evidence: 9. Target field: funding Evidence: 9. Qualification: Canonical institutional identity only. Preserve historical declared spelling, departments, attribution and funding relationships; identity verification alone does not verify an award or its scope. Evidence: 9. Source location: Organization identity and registered names Evidence: 9. Source reference: https://api.ror.org/v2/organizations/020ddnn22 Evidence: 10. Origin: editor_verification Evidence: 10. Target field: publications Evidence: 10. Qualification: Canonical primary and legacy citations are aligned without changing freeform source, inventory source text or inventory contributors. Publication year is not a measurement/reference year. EPR underlying inventories are acknowledged to Roberto Dones and Roth et al. (2009); component quantities are not all printed in the 2012 article. Preserve each declared source role and historical affiliation. Evidence: 10. Source location: Original paper/SI byline; pinned DOI registration and institutional identity evidence Evidence: 10. Source reference: https://doi.org/10.1016/j.ijggc.2013.03.003 Evidence: 11. Origin: editor_verification Evidence: 11. Target field: methodology_notes Evidence: 11. Qualification: Volkart et al. (2013) compare prospective 2025/2050 power and cement systems. The paper's base CCS case uses 200 km pipeline transport and a 1000 m saline-aquifer depth, with 110 bar CO2 transport pressure. Individual CLIC capture, storage, infrastructure and conversion nodes have distinct reference units and adaptations; the publication year is not a common inventory measurement year. The retrieved supplementary XLS contains five cement GHG result decompositions, not a native process inventory; these LCIA results must not be compared as exchange amounts. Source-study CARMA funding roles are preserved without extending them to later CLIC adaptations. Evidence: 11. Source location: Sections 2.1–2.2, source Tables 1–3 and original supplementary XLS Evidence: 11. Source reference: https://doi.org/10.1016/j.ijggc.2013.03.003 Evidence: 12. Origin: editor_verification Evidence: 12. Target field: technology_description Evidence: 12. Qualification: Technical-characterisation review TC-63. Design capacity: Unspecified. Basis: Retain only the current stated object scope; host power, upstream supplier ratings, per-reference intensities and project allocation do not assign every helper its own capacity or annual output. Current object category: fuel_or_syngas_production. Source Table1 performance is prospective; generation calendars and source/native capacity conflicts retain their distinct roles. Evidence classification: source scope and model calendar checked. Confidence: high for model definition not operating performance. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 12. Source location: fields/design_capacity; source paper section2.2/Table1, transport/storage sections; guarded carma-technical-source-context.json Evidence: 12. Source reference: https://doi.org/10.1016/j.ijggc.2013.03.003 Evidence: 13. Origin: editor_verification Evidence: 13. Target field: technology_description Evidence: 13. Qualification: Technical-characterisation review TC-63. Design capacity unit: Unspecified. Basis: Retain only the current stated object scope; host power, upstream supplier ratings, per-reference intensities and project allocation do not assign every helper its own capacity or annual output. Current object category: fuel_or_syngas_production. Source Table1 performance is prospective; generation calendars and source/native capacity conflicts retain their distinct roles. Evidence classification: source scope and model calendar checked. Confidence: high for model definition not operating performance. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 13. Source location: fields/design_capacity_unit; source paper section2.2/Table1, transport/storage sections; guarded carma-technical-source-context.json Evidence: 13. Source reference: https://doi.org/10.1016/j.ijggc.2013.03.003 Evidence: 14. Origin: editor_verification Evidence: 14. Target field: technology_description Evidence: 14. Qualification: Technical-characterisation review TC-63. Capacity factor (%): Unspecified. Basis: Retain only the current stated object scope; host power, upstream supplier ratings, per-reference intensities and project allocation do not assign every helper its own capacity or annual output. Current object category: fuel_or_syngas_production. Source Table1 performance is prospective; generation calendars and source/native capacity conflicts retain their distinct roles. Evidence classification: source scope and model calendar checked. Confidence: high for model definition not operating performance. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 14. Source location: fields/capacity_factor_percent; source paper section2.2/Table1, transport/storage sections; guarded carma-technical-source-context.json Evidence: 14. Source reference: https://doi.org/10.1016/j.ijggc.2013.03.003 Evidence: 15. Origin: editor_verification Evidence: 15. Target field: technology_description Evidence: 15. Qualification: Technical-characterisation review TC-63. Annual production volume: Unspecified. Basis: Retain only the current stated object scope; host power, upstream supplier ratings, per-reference intensities and project allocation do not assign every helper its own capacity or annual output. Current object category: fuel_or_syngas_production. Source Table1 performance is prospective; generation calendars and source/native capacity conflicts retain their distinct roles. Evidence classification: source scope and model calendar checked. Confidence: high for model definition not operating performance. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 15. Source location: fields/annual_production_volume; source paper section2.2/Table1, transport/storage sections; guarded carma-technical-source-context.json Evidence: 15. Source reference: https://doi.org/10.1016/j.ijggc.2013.03.003 Evidence: 16. Origin: editor_verification Evidence: 16. Target field: technology_description Evidence: 16. Qualification: Technical-characterisation review TC-63. Annual production volume unit: Unspecified. Basis: Retain only the current stated object scope; host power, upstream supplier ratings, per-reference intensities and project allocation do not assign every helper its own capacity or annual output. Current object category: fuel_or_syngas_production. Source Table1 performance is prospective; generation calendars and source/native capacity conflicts retain their distinct roles. Evidence classification: source scope and model calendar checked. Confidence: high for model definition not operating performance. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 16. Source location: fields/annual_production_volume_unit; source paper section2.2/Table1, transport/storage sections; guarded carma-technical-source-context.json Evidence: 16. Source reference: https://doi.org/10.1016/j.ijggc.2013.03.003 Evidence: 17. Origin: editor_verification Evidence: 17. Target field: technology_description Evidence: 17. Qualification: Technical-characterisation review TC-63. Annual production volume year: Unspecified. Basis: Retain only the current stated object scope; host power, upstream supplier ratings, per-reference intensities and project allocation do not assign every helper its own capacity or annual output. Current object category: fuel_or_syngas_production. Source Table1 performance is prospective; generation calendars and source/native capacity conflicts retain their distinct roles. Evidence classification: source scope and model calendar checked. Confidence: high for model definition not operating performance. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 17. Source location: fields/annual_production_volume_year; source paper section2.2/Table1, transport/storage sections; guarded carma-technical-source-context.json Evidence: 17. Source reference: https://doi.org/10.1016/j.ijggc.2013.03.003 Evidence: 18. Origin: editor_verification Evidence: 18. Target field: technology_description Evidence: 18. Qualification: Technical-characterisation review TC-63. Plant or represented-asset lifetime (years): Unspecified. Basis: Retain only the current stated object scope; host power, upstream supplier ratings, per-reference intensities and project allocation do not assign every helper its own capacity or annual output. Current object category: fuel_or_syngas_production. Source Table1 performance is prospective; generation calendars and source/native capacity conflicts retain their distinct roles. Evidence classification: source scope and model calendar checked. Confidence: high for model definition not operating performance. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 18. Source location: fields/plant_lifetime_years; source paper section2.2/Table1, transport/storage sections; guarded carma-technical-source-context.json Evidence: 18. Source reference: https://doi.org/10.1016/j.ijggc.2013.03.003 Evidence: 19. Origin: editor_verification Evidence: 19. Target field: technology_description Evidence: 19. Qualification: Technical-characterisation review TC-63. Commercial maturity stage: mature_commercial. Basis: Curator assessment of the established underlying conventional generation, biodiesel, plant infrastructure, pipeline transport/construction or drilling route, as applicable to this exact object category. The primary paper distinguishes these asset/process references from prospective capture integration; commercial storage/drilling context is also corroborated by operator evidence. This is not a source-assigned numeric TRL or validation of this reconstructed LCI. Evidence classification: primary source boundary review and explicit curator assessment. Confidence: medium curator judgement. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 19. Source location: Paper section2.2/Table1 and transport/storage assumptions; volkart-source-reading.json Evidence: 19. Source reference: https://doi.org/10.1016/j.ijggc.2013.03.003 Evidence: 20. Origin: editor_verification Evidence: 20. Target field: technology_description Evidence: 20. Qualification: Technical-characterisation review TC-63. Technology readiness level: 9. Basis: Curator assessment of the established underlying conventional generation, biodiesel, plant infrastructure, pipeline transport/construction or drilling route, as applicable to this exact object category. The primary paper distinguishes these asset/process references from prospective capture integration; commercial storage/drilling context is also corroborated by operator evidence. This is not a source-assigned numeric TRL or validation of this reconstructed LCI. Evidence classification: primary source boundary review and explicit curator assessment. Confidence: medium curator judgement. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 20. Source location: Paper section2.2/Table1 and transport/storage assumptions; volkart-source-reading.json Evidence: 20. Source reference: https://doi.org/10.1016/j.ijggc.2013.03.003 Evidence: 21. Origin: editor_verification Evidence: 21. Target field: technology_description Evidence: 21. Qualification: Technical-characterisation review TC-63. Technological representativeness: 4. Basis: Curator assessment of the exact historical/prospective inventory, with modelled efficiency penalties, transferred supplier/process data or asset/service proxies. The source does not validate the exact current configuration as representative operating plant data. Preserve any existing more conservative score5. Evidence classification: primary source boundary review and explicit curator assessment. Confidence: medium curator judgement. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 21. Source location: Paper section2.2/Table1 and transport/storage assumptions; volkart-source-reading.json Evidence: 21. Source reference: https://doi.org/10.1016/j.ijggc.2013.03.003 Evidence: 22. Origin: editor_verification Evidence: 22. Target field: technology_description Evidence: 22. Qualification: Technical-characterisation review TC-63. Geographical representativeness: 3. Basis: Curator assessment: generic European process/background modelling and selected technology references do not constitute a production-weighted RER factory sample. Treat as regional proxy score3; a global-labelled asset transfers regional evidence and warrants score4. Keep existing more conservative scores. Evidence classification: primary source boundary review and explicit curator assessment. Confidence: medium curator judgement. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 22. Source location: Paper section2.2/Table1 and transport/storage assumptions; volkart-source-reading.json Evidence: 22. Source reference: https://doi.org/10.1016/j.ijggc.2013.03.003 Evidence: 23. Origin: editor_verification Evidence: 23. Target field: technology_description Evidence: 23. Qualification: Technical-characterisation review TC-63. Temporal representativeness: 4. Basis: Retain historical/prospective-model score4: the source uses older underlying data and 2025/2050 performance forecasts. Neither the 2013 publication nor those scenario years establish complete foreground measurement periods or annual observation years. Evidence classification: primary source boundary review and explicit curator assessment. Confidence: medium curator judgement. A retained model value is not a measured observation or industrial certification. Source-specific assumptions and detailed technical parameters accompany this plan. Evidence: 23. Source location: Paper section2.2/Table1 and transport/storage assumptions; volkart-source-reading.json Evidence: 23. Source reference: https://doi.org/10.1016/j.ijggc.2013.03.003 Projects: 1. Url: https://www.psi.ch/fr/eem/projects/carma Projects: 1. Name: CARbon dioxide MAnagement in power generation Projects: 1. Acronym: CARMA Projects: 1. Relation: source_study Projects: 1. Grant identifier: Not set Publications: 1. Doi: 10.1016/j.ijggc.2013.03.003 Publications: 1. Url: https://doi.org/10.1016/j.ijggc.2013.03.003 Publications: 1. Title: Life cycle assessment of carbon capture and storage in power generation and industry in Europe Publications: 1. Scientific authors: 1. Name: Kathrin Volkart Publications: 1. Scientific authors: 1. Orcid: Not set Publications: 1. Scientific authors: 1. Affiliations: 1. Ror: https://ror.org/03eh3y714 Publications: 1. Scientific authors: 1. Affiliations: 1. Url: https://www.psi.ch/ Publications: 1. Scientific authors: 1. Affiliations: 1. Name: Laboratory for Energy Systems Analysis, Paul Scherrer Institute, Villigen PSI, Switzerland Publications: 1. Scientific authors: 2. Name: Christian Bauer Publications: 1. Scientific authors: 2. Orcid: 0000-0002-1083-9200 Publications: 1. Scientific authors: 2. Affiliations: 1. Ror: https://ror.org/03eh3y714 Publications: 1. Scientific authors: 2. Affiliations: 1. Url: https://www.psi.ch/ Publications: 1. Scientific authors: 2. Affiliations: 1. Name: Laboratory for Energy Systems Analysis, Paul Scherrer Institute, Villigen PSI, Switzerland Publications: 1. Scientific authors: 3. Name: Céline Boulet Publications: 1. Scientific authors: 3. Orcid: Not set Publications: 1. Scientific authors: 3. Affiliations: 1. Ror: https://ror.org/03eh3y714 Publications: 1. Scientific authors: 3. Affiliations: 1. Url: https://www.psi.ch/ Publications: 1. Scientific authors: 3. Affiliations: 1. Name: Laboratory for Energy Systems Analysis, Paul Scherrer Institute, Villigen PSI, Switzerland Publications: 1. Citation: Volkart, K., Bauer, C., Boulet, C. (2013). Life cycle assessment of carbon capture and storage in power generation and industry in Europe. International Journal of Greenhouse Gas Control 16, 91–106. https://doi.org/10.1016/j.ijggc.2013.03.003 Publications: 1. Relation: primary_source Publications: 1. Source type: scientific_journal Publications: 1. Publication year: 2013 |
|
Version metadata
|
Technological representativeness |
3 |
4 |
|
Version metadata
|
Technology readiness level |
7 |
9 |
|
Version metadata
|
Description |
Curator note: This activity represents Rape Methyl Ester, at plant in RER; its declared reference amount is 1 megajoule. The original source citation is recorded in the source field. This note was added during metadata curation and introduces no modelling assumptions. |
Rape methyl ester production at the plant, providing 1 MJ of the declared fuel in the RER model. The reference covers the recorded Swiss integrated rapeseed supply, methanol, process heat/electricity and infrastructure material allocation. |
Describe the actual reference flow, process boundary, engineering assumptions and source limitations in reader-facing language. Remove operational review/release instructions and distinguish capacity/component services from operating-energy inputs; the inventory content and declared terms are preserved. |
|
Version metadata
|
Intended application |
Not set |
Fuel supply in the matching conversion/use pathway, retaining the declared at-plant versus at-consumer delivery boundary and the existing carbon and energy normalization. |
Apply reviewed discovery metadata and change explanations from the curated release. |
|
Version metadata
|
System boundary |
Not set |
The archived the recorded Swiss integrated rapeseed supply, methanol, process heat/electricity and infrastructure material allocation per MJ fuel. Downstream fuel combustion is a separate process; the named capture/transport/storage variant is included only where explicitly linked. |
|
Version metadata
|
Technology description |
Not set |
Rape methyl ester production at the plant. The reference is fuel energy, distinct from fuel mass, plant units or a kg CO2 capture service. |
|
Version metadata
|
Limitations on use |
Not set |
The retrieved supplementary workbook contains five cement greenhouse-gas result decompositions, not a native process inventory. It cannot establish exchange-level agreement for this record. The source paper and current inventory have different background and adaptation histories; exact impact reproduction and contemporary regional plant representativeness are not established. |
|
Version metadata
|
Name |
Rape Methyl Ester, at plant |
rape methyl ester, at plant |
Activity and product names now follow consistent catalogue spelling, so the intended inventory and its supplier references remain identifiable. |