Hydrogen via electrolysis

electrolyzer production, 1MWe, PEM, Stack

Reference product electrolyzer, 1MWe, PEM, Stack RER

Superseded Version 1.0.0 Not assessed

Stable dataset identity electrolyzer-production-1mwe-pem-stack

Unit
unit
Reuse license
CC BY 4.0
Published
2026-07-15
Version
1.0.0
Technology maturity
See quality profile

Published inventory

Overview

Process description and catalog context. View scientific metadata

Description

Gerloff (2021; online 9 October) compares 1 MWe AEC, PEM and SOEC systems using modeled component inventories and German 2019, 2030, 2050 and renewable-only electricity scenarios. The paper uses ecoinvent 3.5 cut-off, European or German suppliers where available, Umberto+ and ILCD 2.0 midpoint 2018, with IPCC 2013 for GWP. Oxygen is vented without a product credit. Publication and scenario dates do not date input measurements. This record supplies 1 unit of electrolyzer, 1MWe, PEM, Stack.

The source assumes a 20-year system operating 8000 hours/year, a factor of 3 for stacks, two 250 km component transport legs and estimated manufacturing energy. Later CLIC records adapt manufacturer specifications, lifetimes and materials. The stack reference represents one manufactured unit; operating purchases and corresponding negative retirement are counted once. Source manufacturing estimates are not measured factory energy.

Preserve current source-specific backgrounds, biosphere profiles, attribution and published revisions. Source quantity agreement is not validation of pressure/purity, partial-load operation, metal allocation, ceramic chemistry, membrane grade, waste recovery or uncertainty. Main paper says three stack replacements but multiplies quantities by3; SM1 manufacturing totals also include3stacks. CLIC uses4purchases forPEM/AEC and8forSOEC with distinct adapted lifetimes. Current stack-unit manufacturing energy is source total/3; avoid applying replacement factors in both stack recipe and operating service. Preserve current coordinated choice pending lifetime-model review. Original SM1 PEM figure image2.emf prints0.075kgPt, whereas CLIC2057/4856and pinned later compiler use0.75kg. Iridium0.8kg matches. Resolve tenfold Pt source conflict; no arbitrary decimal correction or numeric revision proposed. SM1 Table3 stack energy includes three stacks; current single-stack recipes correctly use one third, with lifetime purchases handled separately. BOP Table3 totals instead follow near-linear1MW scaling despite the paragraph's0.7exponent: about7.94times its reconstruction. Component intensities may already be scaled. Preserve printed quantities while resolving this source-internal basis conflict. Retrieved IndWEDe is the Kurzfassung; Gerloff cites p178 of the unrecovered full report, so compiler-selected hours/lifetimes are not independently verified from that page.

Dataset details

Classification, keywords, bookmarks and download counts.

Classification
Hydrogen via electrolysis (energy/hydrogen/electrolysis)
Bookmarks
0
Raw file downloads
0
Generated export downloads
7

Classification path: Energy > Hydrogen > Hydrogen via electrolysis

Bookmarking is available only on the latest published dataset record.

Metadata & sources Methods, scope, reference years, publications, contributors, projects and funding.

Source

Source documentation, background profiles and references.

Scientific journal publication

Gerloff, N. (2021; online 9 October 2021). Comparative Life-Cycle-Assessment analysis of three major water electrolysis technologies while applying various energy scenarios for a greener hydrogen production. Journal of Energy Storage 43, 102759. https://doi.org/10.1016/j.est.2021.102759

Inventory changes relative to source: Not assessed

Equivalence to the original source inventory has not been established.

Background database
ecoinvent / 3.9
Background system model
cut-off
Biosphere database
ecoinvent / 3.9

These are the stored source profiles for this version. Foreground methodology is recorded in Scientific metadata.

Technology characterization Scale, utilization, production, lifetime, technology readiness and representativeness.
Commercial maturity stage
Early commercial
Design capacity
1
Design capacity unit
MW
Capacity factor
Not provided
Annual production volume
Not provided
Annual production volume unit
Not provided
Annual production volume year
Not provided
Plant lifetime
20 years
TRL scale Higher is more mature. 9: routine commercial deployment 8: commercial, but still niche or scaling 7: first-commercial or advanced demonstration 6: engineering-scale demonstration 5: pilot or large prototype 4: bench or lab validated 3: research-stage concept Technology readiness level
1 to 5 scale Lower is better. 1: strong market- or operating-data basis 2: commercially plausible, but still somewhat specific 3: partly representative, with modelling or adaptation bias 4: pilot, proxy-based, scaled-up, or prospective 5: weak representation of the real technology state Technological representativeness
1 to 5 scale Lower is better. 1: geography matches the claimed scope well 2: regionally credible, but broader or less exact 3: generic regional or global proxy 4: weak proxy or clear geographic mismatch 5: geography is effectively unsupported Geographical representativeness
1 to 5 scale Lower is better. 1: current for that technology class 2: slightly dated, but still good 3: dated enough to need caution 4: stale, pilot-era, or prospective relative to current practice 5: clearly not representative of the current state Temporal representativeness

Missing exchange uncertainty generation: Not requested

Representativeness scores use a 1–5 scale when provided. Lower scores indicate a closer fit to the modeled technology, geography, or time period.

Inventory & impacts 15 exchanges · exchange table, supply-chain graph and environmental screening.

Precalculated screening profile

Environmental impacts

Results per unit, using UVEK 2025 and the ecoinvent 3.10 biosphere. Exchange rows are shaded from green to red by relative contribution to the selected indicator.

Climate change 75001.4 kg CO2-Eq / unit
Partial screening score

13 of 14 non-zero exchanges were scored (93%). Unmapped exchanges are excluded, not treated as zero.

Screening result

This screening result uses Brightpath mappings from the source background to UVEK 2025; mapped suppliers are not claims of scientific equivalence.

Show all 16 indicator totals
Acidification 2908.26 mol H+-Eq / unit
Climate change 75001.4 kg CO2-Eq / unit
Freshwater ecotoxicity 412364 CTUe / unit
Freshwater eutrophication 66.457 kg P-Eq / unit
Marine eutrophication 40.2738 kg N-Eq / unit
Terrestrial eutrophication 376.89 mol N-Eq / unit
Human toxicity, cancer 8.3576e-05 CTUh / unit
Human toxicity, non-cancer 0.00223585 CTUh / unit
Ionising radiation 23509.1 kBq U235-Eq / unit
Land use 320039 dimensionless / unit
Ozone depletion 0.0425025 kg CFC-11-Eq / unit
Particulate matter 0.00372536 disease incidence / unit
Photochemical ozone formation 292.538 kg NMVOC-Eq / unit
Resource use, fossils 1.0837e+06 MJ, net calorific value / unit
Resource use, minerals and metals 1.90226 kg Sb-Eq / unit
Water use 1.8613e+06 m3 world Eq deprived / unit
Calculation details

Profile uvek-2025-ef-v3-1-4e70d56a85b1 · artifact 4e70d56a85b1 · calculated 2026-11-20 14:59 UTC. These screening results do not replace a reviewed comparative LCA.

Dataset contents

Reference flows, emissions, technosphere inputs, and natural resources in this published snapshot.

Outputs

Reference flow 1 row Reference production exchanges extracted from the uploaded inventory.
Exchange Reference / categories Amount Unit Metadata Climate change contribution
electrolyzer production, 1MWe, PEM, Stack
RER
electrolyzer, 1MWe, PEM, Stack
1
unit Reference flow

Inputs

Technosphere inputs 14 rows Linked foreground or background product inputs used by this dataset.
Exchange Reference / categories Amount Unit Metadata Climate change contribution
market for aluminium, wrought alloy
GLO
aluminium, wrought alloy
27
kilogram
134.302 kg CO2-Eq / unit 0.2% of total
BAFU:2025
market for sheet rolling, aluminium
GLO
sheet rolling, aluminium
27
kilogram
11.8707 kg CO2-Eq / unit 0.0% of total
BAFU:2025
market for titanium
GLO
titanium
528
kilogram
2197.86 kg CO2-Eq / unit 2.9% of total
BAFU:2025
market for tetrafluoroethylene
GLO
tetrafluoroethylene
16
kilogram
1445.85 kg CO2-Eq / unit 1.9% of total
BAFU:2025
market for carbon black
GLO
carbon black
4.5
kilogram
14.9268 kg CO2-Eq / unit 0.0% of total
BAFU:2025
platinum group metal, extraction and refinery operations
ZA
iridium
0.8
kilogram Not scored — no BAFU factor
market for platinum
GLO
platinum
0.75
kilogram
7745.38 kg CO2-Eq / unit 10.3% of total
BAFU:2025
market for carbon black
GLO
carbon black
4.5
kilogram
14.9268 kg CO2-Eq / unit 0.0% of total
BAFU:2025
market for copper, cathode
GLO
copper, cathode
4.5
kilogram
38.2931 kg CO2-Eq / unit 0.1% of total
BAFU:2025
market for sheet rolling, copper
GLO
sheet rolling, copper
4.5
kilogram
1.35966 kg CO2-Eq / unit 0.0% of total
BAFU:2025
market for sheet rolling, chromium steel
GLO
sheet rolling, chromium steel
100
kilogram
42.9588 kg CO2-Eq / unit 0.1% of total
BAFU:2025
market for steel, chromium steel 18/8, hot rolled
GLO
steel, chromium steel 18/8, hot rolled
100
kilogram
42.9588 kg CO2-Eq / unit 0.1% of total
BAFU:2025
market for synthetic rubber
GLO
synthetic rubber
4.8
kilogram
13.7582 kg CO2-Eq / unit 0.0% of total
BAFU:2025
market group for electricity, low voltage
GLO
electricity, low voltage
1.04e+05
kilowatt hour
63297 kg CO2-Eq / unit 84.4% of total
BAFU:2025
Parameters 0 source definitions · values, formulas and uncertainty.

Read-only definitions preserved with this inventory version. Values are supplied by the source; CLIC does not evaluate formulas or recalculate exchange amounts and impact scores from them.

No parameter definitions were supplied with this inventory snapshot.

Reuse and provenance

Downloads & files

This historical version remains available for citation and download, but a newer public version is now current.

Add to download basket

Original source files are currently unavailable, but you can still add this version to your basket for generated package export.

Log in to add to basket
Raw uploaded files 0 files preserved with this version.
Original uploaded files were not included in the inventory archive. Generated inventory exports remain available.
Versions & changes 2 versions · change rationale, release notes and comparisons.

Version history

A newer public version is active, but this superseded record remains available for citation and reproducibility.

Oldest to newest. Arrows show recorded revision links; each node describes the change introduced by that version.

  • Version 1.0.1 revises version 1.0.0.
  1. Version 1.0.0
    Published

    First published inventory; no earlier version is available for comparison.

    Superseded · Viewing
  2. Version 1.0.1
    Published

    Represent the PEM stack membrane as a finished PFSA membrane and the catalyst metal as an iridium-specific, economically allocated production reference, keeping their material…

    Published · Latest
Show full version history table (2 versions)
Version Published Reason for this version Link
Version 1.0.1 2026-11-03 Represent the PEM stack membrane as a finished PFSA membrane and the catalyst metal as an iridium-specific, economically allocated production reference, keeping their material doses. Open version
Version 1.0.0 Superseded Published 2026-07-15 First published inventory; no earlier version is available for comparison. Current view
About this version

About this version

First published inventory; no earlier version is available for comparison.

Review & discussion Publication provenance, scientific review and community discussion.
Public review record Curator-led bulk import. Public evidence is shown without participant accounts, assignments, recommendations, or private editor notes. Show review Hide review

Publication route

Curator-led bulk import

This inventory was restored from a public CLIC archive. Its original publication route is Curator-led bulk import; private review and workflow records were not transferred.

Source inventory archive

No public review transcript is available for this version.
Discussion 0 public comments · questions, context and problem reports.

Public discussion

This discussion record remains visible, but new public comments should be added on the latest published version instead of this superseded one.

No public comments yet. Start the discussion if you have a question about this inventory.
Report this dataset or version

Use this form to report a problem with this dataset or version. To report an individual public comment, use “Report this comment” beside that comment.

Log in to report content